1 | 1 | PRIETO, Matías | h1. Objectives and project planning |
---|---|---|---|
2 | 3 | PRIETO, Matías | |
3 | 14 | PRIETO, Matías | Our Cubesat project is a very tiny project compared to those big missions from huge Space Agencies, like NASA or ESA. |
4 | 3 | PRIETO, Matías | |
5 | 14 | PRIETO, Matías | From a practical and factual point of view, tanking into account the project objectives, there is no needs of having a system engineering structure. However, it is still needed some minimal project planning and control. |
6 | 14 | PRIETO, Matías | |
7 | 15 | PRIETO, Matías | In spite of any system engineering task would be almost useless in our Cubesat project, it would be interesting to... |
8 | 15 | PRIETO, Matías | |
9 | 3 | PRIETO, Matías | h2. Introduction to Systems Engineering |
10 | 3 | PRIETO, Matías | |
11 | 13 | PRIETO, Matías | Systems engineering is the science of developing a system capable of meeting requirements within often opposed constraints. The main task is to find a safe and balanced design in the face of opposing interests and multiple conflicting requirements. In other words, system engineering is about balancing organizational and technical interactions in complex systems. |
12 | 14 | PRIETO, Matías | |
13 | 13 | PRIETO, Matías | Thus, it is about tradeoffs, compromises and generalists rather than specialists in a complex system development process. |
14 | 3 | PRIETO, Matías | |
15 | 3 | PRIETO, Matías | h2. Project life cycle for space missions |
16 | 3 | PRIETO, Matías | |
17 | 3 | PRIETO, Matías | |
18 | 3 | PRIETO, Matías | h2. MsSCS-Cubesat project planning |
19 | 3 | PRIETO, Matías | |
20 | 3 | PRIETO, Matías | |
21 | 8 | PRIETO, Matías | h3. Work Breakdown Structure (WBS) |
22 | 3 | PRIETO, Matías | |
23 | 3 | PRIETO, Matías | |
24 | 7 | PRIETO, Matías | !{width: 100%}WBS_cubesat.jpg! |
25 | 6 | PRIETO, Matías | |
26 | 3 | PRIETO, Matías | h3. Tasks description |
27 | 3 | PRIETO, Matías | |
28 | 3 | PRIETO, Matías | |
29 | 9 | PRIETO, Matías | h3. Gantt planning and PERT analysis |
30 | 4 | PRIETO, Matías | |
31 | 11 | PRIETO, Matías | !{width: 100%}gantt.png! |
32 | 4 | PRIETO, Matías | |
33 | 5 | PRIETO, Matías | [[devlog|Dev Log]] |