1 | 1 | PRIETO, Matías | h1. Objectives and project planning |
---|---|---|---|
2 | 3 | PRIETO, Matías | |
3 | 20 | PRIETO, Matías | Télécom Bretagne has procured a Pumpkin Cubesat kit and other set of tools for education purposes. For more information, please visit [[Equipment inventory]]. |
4 | 1 | PRIETO, Matías | |
5 | 19 | PRIETO, Matías | In order to take full advantage of this kit and begin with the development of different sub-systems, it was proposed a Cubesat-based projectas as part of the Master SCS program. The assigned project is "Experimentation and development of a beacon transmitter for a Cubesat platform". For the sake of simplicity, we will refer to our Cubesat project, developed during 2014/2015, at the Télécom Bretagne laboratory at the SUPAERO campus, as SCS-Cubesat project. |
6 | 19 | PRIETO, Matías | |
7 | 19 | PRIETO, Matías | As it could be guessed, the project main objective is to develop a prototype spacecraft with a beacon transmitter, which will be based on a low cost, low power 434 MHz transmitter. |
8 | 16 | PRIETO, Matías | |
9 | 17 | PRIETO, Matías | The SCS-Cubesat project is a very tiny project compared to those big missions from huge Space Agencies, like NASA or ESA. |
10 | 16 | PRIETO, Matías | |
11 | 1 | PRIETO, Matías | From a practical and factual point of view, tanking into account the project objectives, there is no needs of having a system engineering structure. However, it is still needed some minimal project planning and control. |
12 | 14 | PRIETO, Matías | |
13 | 16 | PRIETO, Matías | In spite of any system engineering task would be almost useless in our SCS-Cubesat project, it would be interesting to... |
14 | 15 | PRIETO, Matías | |
15 | 3 | PRIETO, Matías | h2. Introduction to Systems Engineering |
16 | 3 | PRIETO, Matías | |
17 | 13 | PRIETO, Matías | Systems engineering is the science of developing a system capable of meeting requirements within often opposed constraints. The main task is to find a safe and balanced design in the face of opposing interests and multiple conflicting requirements. In other words, system engineering is about balancing organizational and technical interactions in complex systems. |
18 | 13 | PRIETO, Matías | |
19 | 3 | PRIETO, Matías | Thus, it is about tradeoffs, compromises and generalists rather than specialists in a complex system development process. |
20 | 3 | PRIETO, Matías | |
21 | 1 | PRIETO, Matías | h2. Project life cycle for space missions |
22 | 3 | PRIETO, Matías | |
23 | 3 | PRIETO, Matías | |
24 | 16 | PRIETO, Matías | h2. SCS-Cubesat project planning |
25 | 3 | PRIETO, Matías | |
26 | 3 | PRIETO, Matías | |
27 | 8 | PRIETO, Matías | h3. Work Breakdown Structure (WBS) |
28 | 3 | PRIETO, Matías | |
29 | 3 | PRIETO, Matías | |
30 | 7 | PRIETO, Matías | !{width: 100%}WBS_cubesat.jpg! |
31 | 6 | PRIETO, Matías | |
32 | 3 | PRIETO, Matías | h3. Tasks description |
33 | 3 | PRIETO, Matías | |
34 | 3 | PRIETO, Matías | |
35 | 9 | PRIETO, Matías | h3. Gantt planning and PERT analysis |
36 | 4 | PRIETO, Matías | |
37 | 11 | PRIETO, Matías | !{width: 100%}gantt.png! |
38 | 4 | PRIETO, Matías | |
39 | 5 | PRIETO, Matías | [[devlog|Dev Log]] |