Objectives and project planning » History » Version 21

Version 20 (PRIETO, Matías, 12/07/2014 07:50 PM) → Version 21/37 (PRIETO, Matías, 12/07/2014 07:52 PM)

h1. Objectives and project planning

Télécom Bretagne has procured a Pumpkin Cubesat kit and other set of tools for education purposes. For more information, please visit [[Equipment inventory]].

In order to take full advantage of this kit and begin with the development of different sub-systems, it was proposed a Cubesat-based project projectas as part of the Master SCS program. The assigned project is "Experimentation and development of a beacon transmitter for a Cubesat platform". For the sake of simplicity, we will refer to our Cubesat project, developed during 2014/2015, at the Télécom Bretagne laboratory at the SUPAERO campus, as SCS-Cubesat project.

As it may could be guessed, the project main objective is to develop a prototype spacecraft with a beacon transmitter, which will be based on a low cost, low power 434 MHz transmitter.

The SCS-Cubesat project is a very tiny project compared to those big missions from huge Space Agencies, like NASA or ESA.

From a practical and factual point of view, tanking into account the project objectives, there is no needs of having a system engineering structure. However, it is still needed some minimal project planning and control.

In spite of any system engineering task would be almost useless in our SCS-Cubesat project, it would be interesting to...

h2. Introduction to Systems Engineering

Systems engineering is the science of developing a system capable of meeting requirements within often opposed constraints. The main task is to find a safe and balanced design in the face of opposing interests and multiple conflicting requirements. In other words, system engineering is about balancing organizational and technical interactions in complex systems.

Thus, it is about tradeoffs, compromises and generalists rather than specialists in a complex system development process.

h2. Project life cycle for space missions

h2. SCS-Cubesat project planning

h3. Work Breakdown Structure (WBS)

!{width: 100%}WBS_cubesat.jpg!

h3. Tasks description

h3. Gantt planning and PERT analysis

!{width: 100%}gantt.png!

[[devlog|Dev Log]]