Set-up and testing

Test Set up

In order to test the good behaviour of our program, we should be using the In-Circuit-Debugger ICD3 to debug the program while on the Development Board.
However we never managed to make it work, so we had to resolve to an more simplist and less accurate way of testing the program.

We are reusing the LEDs set up in the [[Erasure codes for Cubesat mission:]] project, and asking the program to lighten the LEDS for seval conditions.

Test Set-up at the lab
Figure : Setup for testing phase

With that set up, we were able to determine that we were effectively determining a temperature which is converted to a 7-bits word.

Moreover we were able to ask the program a rough estimate of the temperature, which he gave us between 25 °C and 30°C